INDEMNITIES IN COMMONWEALTH CONTRACTING

Linda Richardson
Linda Richardson

National Practice Leader, Commercial
T 02 6253 7207 F 02 6253 7301
linda.richardson@ags.gov.au

Paul Lang
Paul Lang

Special Counsel Commercial
T 03 9242 1322 F 03 9242 1481
paul.lang@ags.gov.au

Cathy Reid
Cathy Reid

Senior Executive Lawyer
T 03 9242 1203 F 03 9242 1481
cathy.reid@ags.gov.au

This issue

Indemnities
Commonwealth indemnities in favour of a contractor
Financial framework policy
Contractor indemnities and liability caps
Summary

Risk is an essential consideration in all commercial transactions. Risk determines whether a transaction is viable, and risk is an indispensable —albeit often overlooked—component of the transaction's total price. In the Commonwealth context, risk management is a key component of the Commonwealth financial framework.1

This briefing discusses how risk can be allocated and managed through the use of transactional documents such as contracts and leases, and in particular by a type of contractual clause known as an indemnity. It looks specifically at indemnities given by the Commonwealth (Commonwealth indemnities) and how they are regulated by the financial framework, before considering indemnities given by other parties to the Commonwealth (contractor indemnities) and the associated issue of liability caps.

Indemnities

Terminology

In this briefing, 'risk' is used to mean the chance of something happening that will have an impact on objectives and potential costs. Risk is often specified in terms of events and consequences, and the magnitude of risk is normally determined by the combination of the consequences of an event and the likelihood of that event occurring.2

Another term for the consequence of a risk occurring is 'damage',3 which goes hand in hand with the legal responsibility for the damage, or 'liability'. Legal agreements such as contracts and deeds assign to one or more parties the liability for damage in the event that a specified risk occurs. An indemnity is a particular type of contractual clause that allocates liability between parties, and is normally expressed in the form of one party 'indemnifying' another for a particular class or classes of liability.

In this briefing there is an assumption that the Commonwealth is dealing with a provider of goods or services, who will be referred to as the 'contractor'. The contractor could be anyone—it could be a landlord under a lease; a builder under a works contract; an IT provider; or a specialist consultant engaged by the agency to provide, for example, audit, accounting or legal services. It could be an outsourced payroll function provider; a provider of travel services; a director of a Commonwealth authority or company; or a supplier of goods to the Commonwealth. The discussion is equally applicable to all of these scenarios, but the single term 'contractor' is used for convenience.

Sources of liability

Before examining indemnities in more detail, it is worth commenting on the general nature of contractual liability. One of the primary purposes of all legal agreements is to regulate liability (the other, related, purpose is to provide an agreed statement of the nature of the parties' relationship). It is obvious that, when a party enters into a contract, it is entering into a legally binding arrangement under which it can incur legal liability to the other contracting party for breach of that contract.

However, this does not mean that breach of contract is the only means by which a party may become liable, or that the potential scope of liability is limited to the clauses of the contract. For example, the Commonwealth can lease land from another person, and then conduct an activity which is noisy and noxious and has an adverse effect on other tenants. This could be a breach of the lease, for which the Commonwealth would be liable to the landlord. But it could give rise to liability under other causes of action at the same time. It could also be the tort of nuisance or a breach of applicable environmental legislation.

Identifying all possible sources of potential liability is part of risk management generally. It is particularly relevant to indemnities, however, because being aware of the scope of potential liability assists greatly when it comes to actually considering the terms of proposed indemnities and determining whether they extend the Commonwealth's liability beyond that for which it would be liable in any case (such as in negligence).

What is an indemnity?

At law, an indemnity is a legally binding promise by which one party undertakes to accept the risk of loss or damage another party may suffer. Essentially, it is a promise to 'hold harmless', and these exact words are often used in indemnity provisions, particularly older ones.

The classical form of indemnity is an insurance contract. Under an insurance contract, an insurer agrees to indemnify the policyholder in respect of certain specified losses and liabilities on the occurrence of certain specified events. In this case, the whole contract is one of indemnity.

The context of this briefing is contractual indemnities, which are a specific class of indemnity. A contractual indemnity is typically one provision of a larger commercial arrangement which states that a party agrees to hold harmless another party against the risk of loss or damage that that other party may suffer (including that party's liability to third parties for third party loss resulting from activities under the contract).

Indemnities create contingent liabilities

When a contract is silent as to how liability is allocated between the parties for risks arising because of the contract, each party's liability will be determined at general law on the facts of each event. To provide greater certainty to the parties and/or to shift liability that would have fallen on one party at general law to another party, a liability regime may be agreed and set out in the contract. To achieve this outcome, the regime may impose a contractual obligation to pay money if a specified event occurs (such as an indemnity). This is called a contingent liability (that is, the liability to pay is contingent upon the event occurring).

Anatomy of an indemnity

Invariably, an indemnity can be broken down into four constituent components: 'who', 'what', 'when', and 'how'.

Example

The landlord has requested the grant of an indemnity in the following terms:

The tenant indemnifies the landlord in respect of all actions, claims, proceedings, losses, costs, expenses and damages which the landlord suffers, incurs or becomes liable for and which arise from the tenant's use and occupation of the premises.

Tenant-landlord indemnity diagram

Who gets the benefit of the indemnity?

The first of the four elements is 'who'. This refers to the person that the tenant is indemnifying—in this case, the landlord. In the case of contractual indemnities, the 'who' will almost invariably be the other party to the contract, although sometimes the language used in the contract will be broad enough to extend the 'who' to also include officers, employees, agents, subcontractors, and, in some cases, related parties such as holding companies.

What types of liability does the indemnity cover?

The second element is 'what'. This refers to those things in respect of which the indemnity is granted—in this case, 'all actions, claims, proceedings, losses, costs, expenses and damages'. These are fairly standard terms in an indemnity.

Clearly, there can be a range of different types of liability that might be picked up by this type of language, including liabilities for:

  • tangible losses (for example, death and injury, damage to property)
  • intangible losses (for example, infringement of intellectual property rights, damage to data, disclosure of personal or confidential information)
  • pure economic losses (for example, statutory fines or penalties, lost productivity, loss of opportunity).

When is the indemnity applicable?

The third element is 'when'. In this case, it is those things 'which the landlord suffers, incurs or becomes liable for'. Note that it could have just said those losses, costs and so on 'for which the landlord becomes liable', which is much narrower than losses, costs and so on which the landlord suffers or incurs. This is because the use of the term 'liable' implies a legal obligation to pay (that is, there is no choice), but, in the case of losses incurred, this is broad enough to encompass voluntary expenditure incurred by the landlord in the absence of legal compulsion.

How is the indemnity triggered and what does it cover?

The fourth element is 'how'. It is the most important element of all because it is the trigger that invokes the indemnity. In this case, the trigger is all of those things 'which arise from the tenant's use and occupation of the premises'. This is extremely broad. This indemnity can be activated whether or not there is any fault on the part of the tenant.

A much narrower provision would be something like 'arising out of the negligence of the tenant'. This actually requires actionable negligence on the part of the tenant before the indemnity is triggered. Importantly, this form of indemnity, subject to one qualification, does not extend the tenant's exposure beyond that for which it would be liable, because the common law of negligence would apply in any event (this is especially significant in the context of Comcover insurance).

Legal costs under indemnities

Even where an indemnity is triggered by the tenant's negligence and therefore seemingly goes no further than the common law, it can go further in relation to the award of costs following a court case. Generally, after one side wins a court case it will be awarded costs, but the winning party does not usually get 100% of those costs. However, under this indemnity the landlord would be entitled to 100% of its legal costs. So, commercially, the indemnity does go a little further than the common law in that respect. But it does not expose the tenant to liabilities by way of additional causes of action.

Meaning of 'suffers or incurs'

In the case of the broader 'suffers or incurs' wording, though, the indemnity could result in the tenant incurring liability for which it would not otherwise have been liable. The expression 'arising out of the tenant's use and occupation' is broad enough to capture those things which are not actionable but which nevertheless cause the landlord loss. For example, if the tenant builds a structure on the land with the landlord's consent which blocks out the light and air flow to a neighbouring tenant, and that tenant successfully sued the landlord for derogating from the grant of its lease, the landlord may be able to recover the lost rent from the tenant, despite the landlord's earlier consent.

Proportionate liability legislation

The scope of the tenant's liability may also be affected by proportionate liability legislation in the relevant jurisdiction. Some jurisdictions (for example, Queensland) have proportionate liability regimes that cannot be contracted out of. This may mean that a party's liability is limited to its share of responsibility for another party's loss, irrespective of the form of indemnity contained in an agreement between those parties. As different proportionate liability legislation has been introduced in each jurisdiction, it is important to examine the regime applicable to the jurisdiction relevant to each individual contract. For further information regarding proportionate liability, please see AGS Commercial note No. 23 (30 May 2007; updated 30 October 2007).

Even standard form indemnities need careful consideration

Indemnities come in all shapes and sizes, although the wording (especially in similar classes of legal agreement) can be similar. Nonetheless, it is important to examine the terms of an indemnity before allowing its insertion into a contract, because seemingly innocuous indemnities have the potential to markedly increase risk exposure. Moreover, they are not necessarily labelled as indemnities in the contract.

An example is a clause which indemnifies a specialist contractor for all liability 'arising out of the provision of the specialist services'. The services are being provided for the agency and it has agreed to indemnify the specialist contractor in respect of liability arising out of the provision of the services. However, its terms are arguably wide enough to cover acts of the contractor which are fraudulent, reckless or negligent. So, if the consultant was fraudulent and incurred liability because of that fraud, he or she could arguably seek recourse for the loss from the agency.

Commonwealth indemnities in favour of a contractor

In the sphere of Commonwealth contracting, Commonwealth indemnities are particularly significant because the legal, policy and financial framework within which Australian Government agencies enter into contracts gives specific recognition to, and has specific policies intended to deal with, Commonwealth indemnities.

Indemnities are considered from a number of different perspectives

In assessing an indemnity in the Commonwealth context, there are a number of relevant perspectives, all of which are closely related to each other. The Department of Finance and Deregulation identifies at least five perspectives that agencies should consider, as articulated in Financial Management Guidance documents:

  • First, there is the commercial or financial perspective of an individual agency: what are the commercial or financial implications for the agency, acting on behalf of the Commonwealth, in granting an indemnity to a contractor in relation to a particular contract? That is, what is the potential cost to the affected agency of this commitment requested by the contractor?
  • Second, what are the implications of a proposed indemnity from a financial framework perspective? This deals with the requirement to undertake a risk assessment, obtain authorisation and approval under any applicable regulations and consider Commonwealth and departmental policies in approving proposed spending proposals that contain contingent liabilities.
  • Third, what are the implications of granting a proposed indemnity on the insurance coverage enjoyed by an Australian Government agency?
  • Fourth, what are the implications of a proposed indemnity from a broader Commonwealth policy perspective? For example, is the indemnity contrary to other Australian Government policy, such as policy relating to particular industry sectors? A further consideration is whether it is likely to set an undesirable precedent.
  • Fifth, what is the potential impact on the wider Commonwealth budget should an indemnity crystallise? Indemnities entered into by individual agencies can affect the Commonwealth as a whole if their cost cannot be met from that agency's appropriations.

The second and third perspectives are discussed later in this briefing. It should be emphasised that the consequence of the first perspective is that a decision to grant an indemnity by the Commonwealth is a commercial or financial decision, not a legal decision, although an informed commercial or financial decision will often be made with the assistance of legal advice.

Legislative and policy framework for Commonwealth indemnities

A complete description of the Commonwealth financial framework is beyond the scope of this briefing. For this reason, the following discussion focuses on the key aspects of the financial framework relevant to risk, liability and indemnities.4

The financial framework is underpinned by the Financial Management and Accountability Act 1997 (Cth) (FMA Act), the Financial Management and Accountability Regulations 1997 (Cth) (FMA Regulations), and the Finance Minister's Orders.

FMA legislation

The FMA Act provides the following:

  • Section 44 of the FMA Act states that the Chief Executive of an agency must manage the affairs of the agency in a way that promotes 'proper use' of Commonwealth resources. 'Proper use' means efficient, effective and ethical use.5
  • The Chief Executive of an agency may give instructions (called Chief Executive's Instructions or CEIs) on various matters, including 'making commitments to spend public money' and 'acquiring property that is to be public property' (FMA Regulation 6).

The FMA Regulations provide the following:

  • The Finance Minister may issue guidelines (to be called Commonwealth Procurement Guidelines (CPGs)) about matters relating to the procurement of property and services, including 'matters affecting Commonwealth contracts' (FMA Regulation 7).
  • An official performing duties in relation to the procurement of property or services must have regard to the CPGs (FMA Regulation 8(1)), and an official who takes action that is not consistent with the CPGs must make a written record of his or her reasons for doing so (FMA Regulation 8(2)).
  • An approver must not approve a proposal to spend public money unless satisfied after reasonable inquiry that the proposed expenditure 'is in accordance with the policies of the Commonwealth' and 'will make efficient and effective use of public money' (FMA Regulation 9).6
  • An approver must not approve a spending proposal for which an appropriation of money is not authorised by the provisions of an existing law or a proposed law before the Parliament unless the Finance Minister has given written authorisation (FMA Regulation 10).
  • A person may not enter into a contract, agreement or arrangement under which public money is, or may become, payable unless the proposal to spend the money 'has been approved under regulation 9 and, if necessary, in accordance with regulation 10' (FMA Regulation 13).

A contingent liability relates to money that 'may become payable' under a contract. Therefore, it must be considered as part of the total value of the spending proposal for the purposes of FMA Regulations 13, 9 and 10. A risk assessment is required to assess the value of the contingent liability and the likelihood of the contingent liability being realised, while also providing information about the possible mitigation of the risk being accepted under the contingent liability.

Financial framework: steps required to enter into a contract

Step 1 FMA Regulation 10 authorisation must be obtained (if required).

Step 2 FMA Regulation 9 approval of a proposal to spend public money must be obtained. The delegate must be satisfied that the expenditure will be:

  • an efficient and effective use of public money
  • in accordance with Commonwealth policies (including CPGs and Indemnity Guidelines (see below)).

Step 3 The contract must be executed by an authorised person/delegate—usually a delegate under Section 44 of the FMA Act.

Financial framework policy

FMA Regulation 10

When is FMA Regulation 10 authorisation required for a contract that contains an indemnity?

If there is insufficient uncommitted appropriation to meet the maximum value of the spending proposal (which will generally be the case, for example, where the risk assessment cannot quantify the contingent liability under the indemnity), the operation of FMA Regulation 10 may be triggered and the spending proposal may need to be authorised in accordance with that regulation. After any necessary FMA Regulation 10 authorisation has been obtained, a spending proposal that contains a contingent liability will also require approval pursuant to FMA Regulation 9 before the contract, agreement or arrangement underpinning the spending proposal can be entered into under Section 44 of the FMA Act and in accordance with FMA Regulation 13.

It is recommended that agencies do not seek FMA Regulation 10 authorisation unless they are confident they would otherwise meet the requirements for FMA Regulation 9 approval, including compliance with relevant policies such as Finance Circular 2003/02, Guidelines for Issuing and Managing Indemnities, Guarantees, Warranties and Letters of Comfort (Indemnity Guidelines) (discussed below).

Finance Circular 2007/01

Finance Circular 2007/01, FMA Regulation 10, issued by the Department of Finance and Deregulation, informs officials that a spending proposal that relates to a contract, agreement or arrangement which contains an uncapped contingent liability (for example, an uncapped indemnity from the Commonwealth) will always require FMA Regulation 10 authorisation unless it is supported by a special appropriation that covers the maximum amount that would or could become payable under the contract, agreement or arrangement.

So, in the lease example used above on p 3, if the Commonwealth is the tenant giving the usual indemnity in respect of the tenant's negligence, that indemnity, as standard and innocuous as it seems, will trigger the need for FMA Regulation 10 authorisation, simply because it is by definition unquantifiable.

It is possible to give a Commonwealth indemnity that does not require FMA Regulation 10 authorisation where there is sufficient uncommitted appropriation available to support the maximum amount that could become payable if the indemnity crystallised. This may be the case where the indemnity contains a financial limit (or where a financial limit can be calculated). It would then be possible to ascribe a quantifiable financial exposure to the grant of the indemnity and reach a conclusion that there is sufficient uncommitted appropriation for the total value of the spending proposal. Note, however, that, if the available appropriation is insufficient, FMA Regulation 10 authorisation would nonetheless be required despite the inclusion of a limit.

Obtaining FMA Regulation 10 authorisation for a contract with a Commonwealth indemnity

If the operation of FMA Regulation 10 has been triggered, the authorisation of the Finance Minister is required before a spending proposal can be approved.

FMA Regulation 10 authorisation can be obtained in three ways:

  • under the FMA Regulation 10 delegation
  • under an agency-specific determination
  • from the Finance Minister.

FMA Regulation 10 delegation

The Finance Minister has delegated the exercise of his power in certain circumstances, with conditions, to agency Chief Executives.

The delegation contains a number of directions that must be followed by delegates considering whether to grant an authorisation under FMA Regulation 10. For example, it includes provision for a delegate to give an FMA Regulation 10 authorisation under the delegation where all of the following are satisfied:

  • the spending proposal includes a contingent liability of the Commonwealth that is an integral part of the spending proposal
  • the spending proposal, apart from the presence of the contingent liability, would otherwise satisfy the requirements of the delegation for the authorisation of departmental spending proposals or administered spending proposals (for example, in relation to amount and duration of expenditure under the proposal)
  • the most probable expenditure that could arise under the contingent liability would be of an amount that would not be considered to be material if the contingency were to occur
  • the contingency has a remote chance of occurring.

In effect, the delegation requires that a risk assessment be carried out in relation to the contingent liability, which is consistent with the Indemnity Guidelines.

Agencies contemplating seeking authorisation under the delegation should also consult their CEIs for agency-specific guidance to delegates, and the scope of the delegation. If necessary, legal advice should be sought as to whether the spending proposal can be approved under the delegation.

FMA Regulation 10 agency-specific determinations

Agencies should also note that it is possible to seek a determination from the Finance Minister that varies the limits of the delegation to address specific circumstances.

FMA Regulation 10 authorisation from the Finance Minister

Where a spending proposal does not fit within the scope of the delegation or an agency-specific determination, authorisation from the Finance Minister will be required. Agencies should consider the timeframe and procedural steps required in order to obtain such an authorisation in developing their procurement timetable and strategy.

Indemnity Guidelines

Indemnity Guidelines must be complied with for FMA Regulation 9 approval

The Indemnity Guidelines were published in September 2003 as Financial Management Guidance No. 6 in conjunction with Finance Circular 2003/02, Guidelines for Issuing and Managing Indemnities, Guarantees, Warranties and Letters of Comfort.

The Indemnity Guidelines are a policy of the Commonwealth, and approvers are required by FMA Regulation 9 to ensure that expenditure is in accordance with the Indemnity Guidelines when considering whether to approve proposals to spend public money.7 As with other instances of non-compliance with the FMA Act, Regulations and other specified financial management policy, there is a requirement that non-compliance must be reported in the agency's Certificate of Compliance.8

The Indemnity Guidelines essentially divide indemnities into two classes:

  • losses or damages for which the Commonwealth may otherwise be liable even in the absence of an indemnity
  • losses or damages for which the Commonwealth would not otherwise have been liable without having issued an indemnity.

The Indemnity Guidelines state (at p 7):

The Australian Government's policy on issuing indemnities, guarantees, warranties and letters of comfort is to accept such risks only when the expected benefits, financial or otherwise, are sufficient to outweigh the level and cost of the risk which the Commonwealth would be assuming. As a matter of principle, risks should be borne by those best placed to manage them—that is the Australian Government should generally not accept risks which another party is better placed to manage.

Significantly, the Indemnity Guidelines emphasise that there needs to be an explicitly identified risk before an indemnity may be granted.

Relevant factors for Indemnity Guidelines

The Indemnity Guidelines set out an extensive list of factors that should9 be taken into account before an indemnity is provided, including mitigation measures and alternatives such as:

  • time limits on the indemnity (for example, to claims made during the term of the contract)
  • use by the contractor of commercial insurance
  • reserving a termination right for the Commonwealth
  • the imposition of maximum financial limits on claims
  • the insertion of subrogation and notification clauses that give the Commonwealth the right to take over any litigation related to the indemnity.

There is also a recommendation that the indemnity does not cover damage from acts by the indemnified person which are 'malicious, fraudulent, wilful, illegal, reckless etc'. This policy mirrors the Corporations Act 2001 (Cth), ss 199A–199C, and the Commonwealth Authorities and Companies Act 1997 (Cth), ss 27M–27P, which limit the circumstances in which Commonwealth companies and authorities may indemnify officers against their own conduct and insure them in respect of liabilities arising out of that conduct.

Requirement to seek legal advice

The Indemnity Guidelines contain a further recommendation that legal advice should be sought, where appropriate, to ensure that the Commonwealth is exposed to the minimum risk necessary to achieve the particular objective. The questions on which legal advice is suggested to be sought are very comprehensive. They include:

  • whether any applicable legislation restricts the scope of executive power of the Commonwealth to enter into the arrangement (more likely to be applicable to loan guarantees than to indemnities: see FMA Regulation 14(2))
  • whether the party to be provided with the indemnity is actually exposed to the purported risks and what the potential liabilities could be
  • the extent to which the proposed indemnity protects another party against liabilities imposed on them by common law or legislation—if this is the case, the indemnity should be excluded unless there is a clear justification for the agency giving it
  • whether the proposed indemnity only seeks to replicate liabilities imposed on the Commonwealth by common law or Commonwealth legislation—if so, as noted above, the Indemnity Guidelines state that the provision is redundant and should be excluded unless there is a clear justification for the agency granting the indemnity (an agency may, for example, take the view that normal industry practice or likely additional costs constitute 'clear justifications')
  • the extent to which FMA Regulation 10 applies.

Risk management under the Indemnity Guidelines

A persistent theme in the Indemnity Guidelines is one of effective risk management. A number of requirements either directly or implicitly contemplate that the risk identification and assessment process has been carried out. There are references to indemnities being granted only in respect of 'explicitly identified risks'; to 'the expected benefits objectively outweighing the level and costs of the risks'; to agencies having 'assessed the specific risks to be covered'; to potential losses having been 'rigorously investigated and identified'; and to appropriate risk management arrangements being in place.

All of these references assume appropriate risk assessment and management. The Indemnity Guidelines provide a brief outline of appropriate risk management processes, but for more detail agencies should consult AS/NZS 4360:2004: Risk Management.10

Commonwealth Procurement Guidelines

The CPGs make it clear that, as a general principle, risk should be borne by the party best placed to manage risk: an agency should not generally accept risks that another party is best placed to manage and should not seek to transfer risks that it is best placed to manage to a contractor. The CPGs also note that the extent of risk management should be commensurate with the type of procurement process. They emphasise that agencies should consider risk:

  • at the commencement of a procurement process
  • when deciding upon the appropriate procurement method to use
  • when determining the relative value for money of proposals
  • throughout the course of a project including in relation to relationship management, contract management and termination/transition management.

Importantly, the CPGs require that agencies must undertake a risk assessment as an initial exercise when considering whether granting an indemnity would be appropriate and, if it is appropriate, what limits on the indemnity would be suitable. The agency should develop and implement a risk management plan if an indemnity is given.

The CPGs also recommend that request documents for more complex processes include draft contracts with clear liability provisions against which tenderers should indicate compliance and that alternative liability regimes proposed by tenderers should be priced.

Chief Executive's Instructions

Specific guidance to an agency's officers on financial management can be provided by the Chief Executive's Instructions (CEIs) issued by the agency's Chief Executive under FMA Regulation 6. CEIs are legally binding upon the officers of that agency under the FMA legislation.

To assist agencies in developing their own CEIs, Finance Circular 2004/15: Chief Executive's Instructions attaches Guidance on the Development of Chief Executive's Instructions, which assumes that agency CEIs will contain a section on contingent liabilities (including indemnities).

Although agency specific, in terms of providing guidance and instruction to officers on Commonwealth procurement policies and practice (including managing risk) CEIs largely encapsulate and expand upon the FMA legislation, CPGs and relevant Finance circulars.

Summary of the financial framework

The combined effect of the requirements of the financial framework and relevant Commonwealth policies is that agencies that are requested to provide an indemnity to another party should do the following:

  • Apply the principle that the party best placed to manage a risk should be responsible for that risk.
  • Carry out a risk assessment to determine whether an indemnity should be provided.
  • If an indemnity is to be granted, seek to limit any potential liability under the indemnity (for example, by including financial caps and time limits) where appropriate.
  • Seek appropriate approvals before entering into an indemnity.
  • Actively manage the risks associated with the indemnity through development and implementation of a risk management plan to reduce the likelihood of it being called upon.
  • Only accept risks where the expected benefits, financial or otherwise, are sufficient to outweigh the level and cost of the risk which the Commonwealth would be assuming.

Comcover considerations for Commonwealth indemnities

It is beyond the scope of this briefing to comprehensively discuss the relationship between risk management and insurance.11 However, that relationship is obviously an aspect of risk management. This was given fresh impetus with the establishment of Comcover, the insurable risk-managed fund, in 1998. The then Finance Minister, in announcing Comcover, stated:

The policy of non-insurance, which has been in place since 1909, offers little incentive for public sector organisations to manage their risks effectively. The introduction of the new fund will, for the first time, require the systematic identification, quantification, reporting and management of risk across Commonwealth departments and agencies.

Many quantifiable contingent liabilities are uninsurable by nature, but agencies need to have regard to those risks that are insurable risks in accordance with Comcover's policy terms and conditions. It should be noted that Comcover, as part of its risk management services, provides advice to Commonwealth agencies on how to effectively manage risks and assists in seeking to instil a proper risk management culture via education programs and regular risk assessments. In June 2008, Comcover released a Better Practice Guide on Risk Management.

From a practical perspective, agencies that intend to provide indemnities should be aware of Comcover policy condition 2.9.12 (effective from 1 July 2004), which excludes from coverage 'liability arising out of any indemnity unless the liability would have arisen in the absence of such indemnity'. In other words, Comcover does not cover any liability under an indemnity beyond that for which an agency would have otherwise been liable unless specific approval is obtained from Comcover beforehand. One consideration in relation to whether coverage will be granted is whether the Indemnity Guidelines have been complied with (see Comcover policy part 3.5).

As noted above, an adequate assessment of whether an indemnity does go beyond (rather than merely restates) the common law position requires an understanding that liability can arise from different sources (and not just breach of contract).

It should be noted that the presence of insurance, whether through Comcover or a commercial insurer, does not affect the need for appropriate authorisations and approvals in accordance with the FMA Regulations for the full amount that may become payable under the spending proposal.

Commonwealth indemnities tips

  • The decision to grant an indemnity must be informed by an agency's commercial objectives and wider Commonwealth policy objectives.
  • Consider the wording of an indemnity carefully, even if it is a standard form indemnity, as small changes to wording can make a big difference to liability.
  • Always undertake a risk assessment.
  • Discuss any proposed Commonwealth indemnity with Comcover.
  • Spending proposals that contain indemnities must be approved under FMA Regulation 9.
    • Where a contract contains a Commonwealth indemnity, this creates a contingent liability. Contingent liabilities have to be taken into account in quantifying the spending proposal for the purposes of FMA Regulation 9.
    • There are guidelines for issuing and managing indemnities that must be followed for the spending proposal to be approved under FMA Regulation 9. Under these guidelines, agencies should seek to limit any potential liability (for example, by including financial caps and time limits) where appropriate.
  • In addition, any spending proposal that is not fully supported by an appropriation requires authorisation under FMA Regulation 10.
    • Spending proposals that contain an uncapped/unquantifiable indemnity will generally require FMA Regulation 10 authorisation unless supported by an uncapped special appropriation.
    • FMA Regulation 10 authorisation for indemnities can sometimes be given under the delegation from the Finance Minister. There are specific requirements under the delegation, including that the most probable expenditure will not be material and the contingency has a remote chance of occurring.
    • If the delegation is not available, in most cases authorisation from the Finance Minister will be required. Take this into account in planning the procurement/contracting process.

Contractor indemnities and liability caps

This briefing has so far looked at the Commonwealth's liability to the contractor, particularly where the Commonwealth grants an indemnity to the contractor. In this section we look at the contractor's liability to the Commonwealth.

Typically, Commonwealth contracts will contain an indemnity from the contractor to the Commonwealth. The principles discussed above about the 'who', 'what', 'when' and 'how' of indemnities (above, pp 3–4) are equally relevant to indemnities provided by contractors.

What is a liability cap?

One of the most common issues that arise in relation to a contractor's liability to the Commonwealth is the issue of liability caps. A liability cap is a contractual provision which caps the liability of one contracting party to the other contracting party under the contract to a certain amount.

Anatomy of a liability cap

A useful way of looking at liability caps is to break them down into the following three components: 'who', 'what', and 'how (much)'.

Example

A contractor requests a liability cap in the following terms:

The aggregate liability of the contractor to the Commonwealth arising out of the contractor's performance of the contract is $X.

Contractor liability diagram

Who gets the benefit of the liability cap?

A liability cap benefits the party whose liability is being capped, which in this case is the contractor. In respect of liabilities covered by the cap, the contractor's liability to the Commonwealth will be limited to the amount of the cap. The Commonwealth will bear the risk for all amounts above the amount of the cap.

What does the liability cap cover?

This refers to the types of liability covered by the liability cap. In this case, the liability cap is very broad and does not restrict the types of liabilities covered provided that they arise out of performance of the contract. This could include claims for breach of contract, negligence or statutory claims. Note also that unless the liability cap is linked to the contract in some way, the cap may be taken to apply to liabilities the contractor has to the Commonwealth that have nothing to do with the contract.

In most cases, the liability cap will be drafted so as to exclude certain liabilities for which the contractor is to retain unlimited liability. For example, the Commonwealth's policy in relation to liability caps in information and communications technology (ICT) contracts lists a range of liabilities that should ordinarily be excluded from the operation of liability caps in ICT contracts. This policy is discussed further below.

It is important to consider the relationship between the liability cap and other provisions of the contract. For example, a liability cap in one part of the contract may limit an indemnity contained in another part of the contract.

Liability caps sometimes limit or exclude liability for 'consequential loss'. A recent Victorian Court of Appeal case indicates that the term 'consequential loss' is likely to cover 'everything beyond the normal measure of damages, such as profits lost or expenses incurred through breach'.12

How (much): i.e. how should the liability cap be set?

The liability cap will apply where the amount of the contractor's liability exceeds the amount of the cap. In this case, the amount of the liability cap is $X. As the clause provides that this is the 'aggregate liability' of the contractor, $X is the total amount for which the contractor will be liable to the Commonwealth in respect of liabilities that are covered by the cap. Liability caps can also be made to apply on a per event basis or on aggregate basis over a certain period of time. Sometimes the parties agree to both a per event cap and an aggregate cap.

Liability caps are usually triggered when the party whose liability is being capped incurs a liability to the other contracting party in relation to the contract. In this case, the cap is triggered by liabilities of the contractor to the Commonwealth 'arising out of the contractor's performance of the contract'.

Another type of cap that should be avoided is capping liability to what the contractor can recover from insurance. This type of cap is fraught with difficulty because it is likely to be reliant on:

  • the detailed terms and conditions of the contractor's insurance policy (and, in particular, it is subject to any exclusions set out in the policy)
  • the contractor actually complying with the requirements of the policy so as not to void the insurance.

As a result of its activities under the contract, the contractor may be liable to the Commonwealth for loss, damage or expense that the Commonwealth has suffered directly (for example, for damage to Commonwealth property) or indirectly (for example, for claims by third parties against the Commonwealth for third party loss as a result of the contractor's actions). The only way to properly determine an appropriate amount for a liability cap is through a risk assessment.

Liability caps and the financial framework

Do liability caps trigger the need for FMA Regulation 10 authorisation?

Whether a liability cap triggers the need for FMA Regulation 10 authorisation depends on the kinds of liability limited by the cap.

According to Finance Circular 2007/01, spending proposals containing the following types of liability cap will be regarded as contingent liabilities and will generally, depending on the limits of the relevant appropriation, require FMA Regulation 10 authorisation:

  • liability caps limiting a contractor's liability to a third party so that the Commonwealth is liable to the third party for any excess
  • liability caps limiting a contractor's exposure for damage the contractor has itself suffered so that the Commonwealth is liable to the contractor for any excess
  • liability caps limiting a contractor's liability to meet costs that the Commonwealth may seek to recover from the contractor, where a third party has sued the Commonwealth for damage resulting from the contractor's action or inaction.

However, if a liability cap only limits a contractor's liability to the Commonwealth for damage that the contractor directly causes the Commonwealth, the Commonwealth's policy in Finance Circular 2007/01 is that the liability cap will not, of itself, result in a need to obtain FMA Regulation 10 authorisation.

Commonwealth Procurement Guidelines requirements

The CPGs provide that proposed limitations on liability should be considered in a similar way to indemnities (see pp 11-12). That is, a risk assessment is required to identify whether to agree to a cap and also what would constitute an appropriate limit. Further, liability caps are relevant to the determination of value for money and, if a decision to limit liability is taken, a risk management plan should be developed.

Indemnity Guidelines

Agencies must also comply with the Indemnity Guidelines (including the requirement to undertake a risk assessment) before approving a spending proposal that involves a contingent liability (see Finance Circular 2007/01).

Legal advice may be required

To assist in determining whether FMA Regulation 10 authorisation is required for a spending proposal containing a liability cap, Finance Circular 2007/01 states that agencies may need to consider obtaining legal advice to clarify the scope of the proposed liability cap.

Liability caps in information and communications technology contracts

Both the CPGs and the Indemnity Guidelines provide that risks should generally be borne by the party best placed to manage them.

This principle would dictate that, in general, where a contractor is better placed to manage the risk associated with its provision of goods or services to the Commonwealth, the contractor's liability to the Commonwealth in respect of that risk should not be limited by contract. However, as a matter of Commonwealth policy, liability caps in ICT contracts are a specific exception.

Finance Circular 2006/03, Limited Liability in Information and Communications Technology Contracts, provides that, as a matter of Commonwealth policy, the liability of ICT suppliers contracting with Commonwealth agencies should be capped at appropriate levels in most cases, particularly in relation to:

  • standard breach of contract in relation to service delivery obligations
  • contractor liability arising from negligent acts or omissions (other than negligent acts or omissions in relation to the matters specified below).

However, it is generally appropriate (unless there is a compelling reason otherwise) for agencies to retain unlimited liability clauses in ICT contracts relating to personal injury (including sickness or death), unlawful or illegal acts, damage to tangible property, intellectual property obligations, confidentiality and privacy obligations, and security obligations.

Notwithstanding this unique treatment of liability caps in relation to ICT contracts under Commonwealth policy, FMA Regulation 10 authorisation may still be required (see above) and the CPGs and the Indemnity Guidelines should otherwise be complied with in the process of determining whether to agree to such a cap. In particular, a risk assessment should be undertaken and legal advice appropriate to the complexity of the purchase and the level of risk should be obtained in relation to liability caps in ICT contracts.

For more information on liability caps in ICT contracts, see T. Beal and S. Hilton, 'New FMA Regulation 10 delegation: its interaction with the ICT liability policy', AGS Commercial notes No. 26 (8 May 2008).13

Comcover considerations for liability caps

Agencies should also be aware that the Comcover policy provides for Comcover to be subrogated to the rights of the agency when a claim payment is made. It may be a breach of the policy to agree to a proposed liability cap without disclosing that fact to Comcover under condition 2.10.3 of the policy or under condition 2.9.13 on the basis that the agency has 'otherwise compromised [the agency's] legal position'. This may entitle Comcover to refuse to indemnify the agency. AGS sought clarification from Comcover on this issue, and Comcover's reply was as follows:

It must be stressed that the decision to include a liability cap within a contract is entirely the responsibility of the agency involved. There is no requirement to obtain Comcover approval for liability caps. However, if the liability cap relates to an insurable risk and the agency wishes Comcover to fund potential losses arising out[side] of the cap, then approval must be sought for Comcover's agreement to waive its right of subrogation. This approval must be sought in advance and provided in writing.

Liability caps for damage to other agencies' property

There are some additional considerations for agencies if they are considering capping a contractor's liability for damage to Commonwealth property that is not the responsibility of the agency. Section 44 of the FMA Act states that a Chief Executive must manage the affairs of the agency in a way that promotes the efficient, effective and ethical use of Commonwealth resources for which the Chief Executive is responsible. Therefore, when determining whether there is sufficient justification to issue a liability cap that limits a contractor's liability for damage to Commonwealth property for which that Chief Executive is not responsible, the Department of Finance and Deregulation advises that the risk assessment should consider the impact on other agencies.

The Department also advises that, if the liability cap is likely to affect a small number of agencies, the Chief Executive should consider consulting with those agencies. If the liability cap is likely to affect all agencies, the Chief Executive should consider consulting with Finance.

This is in addition to any requirements under Regulation 9 that a spending proposal must not be approved unless, among other things, it is in accordance with the policies of the Commonwealth.

In addition, an agency's Comcover policy relates to the insurable risks for which that agency is responsible. If a proposed liability cap relates to insurable risks for which another agency is responsible then Comcover may need to consult that agency. This can arise where a liability cap is expressed to encompass damage to Commonwealth property and, in the circumstances of the particular contract, there is a potential for the contractor to cause damage to Commonwealth property administered by more than one Commonwealth agency.

Contractor insurance considerations

This briefing does not look in any detail at commercial insurance, which is a substantial area in its own right. However, agencies should be aware that, in the context of Commonwealth contracts, the primary purpose of requiring the contractor to hold commercial insurance in relation to particular liabilities is to ensure that the contractor will have the necessary resources to meet any liabilities that arise as a result of the contract. Agencies should bear in mind the following:

  • The fact that a person is required to hold insurance for a particular type of liability does not of itself make them liable for that type of liability. The common law, legislation or the terms of the contract will determine if that liability exists.
  • Agreement to a certain level of insurance does not generally equate to agreement to limit liability to that level. Agencies need to take care to avoid any misunderstandings about this issue.
  • Commercial insurance policies often contain a range of terms and conditions which can impact on whether or not a claim may be made in particular circumstances. This can have a significant bearing on the effectiveness of the policy.
  • In some cases, it is necessary to obtain specialist insurance advice in relation to proposed insurance arrangements for contractors.

Liability caps checklist

  • As with indemnities:
    • a risk assessment must be undertaken and, if necessary, a risk management plan implemented
    • remember that risk should generally be borne by the party best placed to manage the risk
    • the decision whether to agree to a liability cap must be informed by an agency's commercial objectives and wider Commonwealth policy objectives
    • the Indemnity Guidelines should be complied with if the liability cap creates a contingent liability
    • some liability caps may require FMA Regulation 10 authorisation
    • it may be possible for that authorisation to be provided under the delegation from the Finance Minister.
  • There is a specific policy in relation to capping contractor liability in ICT contracts.
  • Where a liability cap affects more than one agency, it may be prudent to discuss it with other affected agencies or the Department of Finance and Deregulation.
  • It is prudent to discuss liability caps with Comcover.
  • Take care with the relationship between contractor indemnities, liability caps and contractor insurance.

Summary

The main points in this briefing are as follows:

  • The decision to provide a Commonwealth indemnity or a cap on contractor liability is not a legal decision, although it should obviously be informed by sound legal advice.
  • Indemnities require compliance with the CPGs and the Indemnity Guidelines.
  • It is not enough to say that a contractor has sought an indemnity or a liability cap; agencies need to go that further step and analyse the risks accepted under the indemnity or the liability cap.
  • In carrying out indemnity risk assessments, agencies should consider the anatomy of the indemnity by reference to the four-step analysis ('who', 'what', 'when' and 'how') described above on pp 3–4.
  • Follow the Indemnity Guidelines, particularly in relation to when a Commonwealth indemnity may be granted, the conditions which should be included and when to seek legal advice.
  • Most uncapped Commonwealth indemnities trigger the need for FMA Regulation 10 authorisation and, if it is required, the authorisation must be given before FMA Regulation 9 approval can be sought.
  • In some cases, the FMA Regulation 10 authorisation can be sought from within the agency under the FMA Regulation 10 delegation, but, in other cases, it may need to be sought from the Finance Minister.
  • Liability caps which create a contingent liability require compliance with the Indemnity Guidelines and may trigger FMA Regulation 10, depending on the limits of the relevant appropriation. The policy relating to capping liability in ICT contracts does not obviate the need for FMA Regulation 10 authorisation.
  • Finally, and most importantly, whether one is dealing with the legal, commercial, insurance or financial aspects of liabilities and indemnities, a risk assessment is required.

 

This briefing is based on the 2006 Legal briefing 79, 'Indemnities in Commonwealth Contracting' (by Linda Richardson, Andrew Miles, Shaun Tipson and Cathy Reid) and an updated version, published as Legal briefing 86 in July 2006 (by Linda Richardson, Andrew Miles, Kathryn Evans and Cathy Reid).

Linda Richardson is the National Leader of our Commercial Practice and has extensive expertise in commercial work, specifically government tendering and contracting and Commonwealth accountability. She has significant experience as a negotiator of commercial and government-to-government agreements and has drafted best practice guidance for various agencies.

Paul Lang is a Special Counsel in our Commercial group. He has advised the Australian Government in many significant and complex commercial projects. He has an extensive background in public sector procurement, tendering and contracting, probity and process advice, privatisation, corporatisation, outsourcing, and grants and funding agreements.

Cathy Reid is the National Manager of our Commercial Practice and has advised government on a wide range of procurement and privatisation projects involving negotiation of complex risk allocation and management issues such as indemnities and liability caps.

Notes

  1. This briefing uses 'agencies' to refer to agencies that are subject to the FMA regime. However, much of the discussion is also applicable to Commonwealth Authorities and Companies Act 1997 (Cth) bodies in that it represents a prudent approach to the question of risk management.
  2. Standards Australia, Australian/New Zealand Standard AS/NZS 4360: 2004 Risk Management at [1.3.13].
  3. This briefing uses the word 'damage'—which implies a negative consequence—because this is the type of risk that is most often managed contractually. For completeness, note that AS/NZS 4360:2004 defines 'risk' to include events that have both positive and negative outcomes. These positive (and less often analysed) risks are often referred to as 'opportunities'.
  4. See Finance Circular 2008/06: Commitments to Spend Public Money (FMA Regulations 7 to 13) for more information.
  5. Note that, in accordance with amendments to the FMA Act that commence after 20 March 2009, the definition of 'proper use' will also provide that the use must not be inconsistent with the policies of the Commonwealth.
  6. FMA Regulation 9 should properly be read in conjunction with Section 44 of the FMA Act, 'Promoting efficient, effective and ethical use of Commonwealth resources'. In that section, 'proper use' means 'efficient, effective and ethical use'. Managing risk is implicit in both Section 44 of the FMA Act and Regulation 9 of the FMA Regulations. See also foonote 5.
  7. A further policy of the Commonwealth relevant to this briefing is the policy in relation to indemnification of officials, which is currently Finance Circular 1997/19: Indemnification of Persons Acting in an Official Capacity on Behalf of the Commonwealth or Commonwealth Bodies, available from http://www.finance.gov.au/finframework/fc_1997_19.html. This circular deals with assistance in legal proceedings and potential legal proceedings, and it should be considered before any indemnity in relation to legal costs is given. Note that it is understood that this policy will be updated.
  8. See Finance Circular 2008/04: Certificates of Compliance—FMA Act Agencies.
  9. The Indemnity Guidelines do not impose an absolute prohibition on agencies entering into indemnities without complying with the listed preconditions (see pp 9–10). However, under the Indemnity Guidelines, agencies that do not impose one or more of the preconditions must record the reasons for this in writing.
  10. See also Management Advisory Board, MAB/MIAC Report No. 22, Guidelines for Managing Risk in the Australian Public Service, October 1996.
  11. There is a comprehensive discussion of this topic in a speech given by then Deputy Auditor-General, Ian McPhee, to the National Institute for Governance on 16 October 2002, entitled 'Risk Management and Governance'. The speech can be accessed on the ANAO website.
  12. Environmental Systems Pty Ltd v Peerless Holdings Pty Ltd [2008] VSCA 26 at [93] per Nettle J.
  13. The issue is available at http://www.ags.gov.au/clients/agspubs/legalpubs/commercialnotes/CN26.pdf

AGS contacts

John Scala
John Scala Chief Counsel, Commercial
T 03 9242 1321 F 03 9242 1481
john.scala@ags.gov.au

Linda Richardson
Linda Richardson National Practice Leader, Commercial
T 02 6253 7207 F 02 6253 7301
linda.richardson@ags.gov.au

AGS has a large national team of lawyers specialising in indemnities, liabilities and risk management. For further information on this issue please contact John Scala, Linda Richardson or any of the other lawyers listed below.

Tony Beal
Philip Crisp
Henry Addison
Rachel Chua
Helen Curtis
Terry De Martin
Peter Kidd
Andrew Miles
John Snell
Adrian Snooks
John Williams

02 6253 7231
02 6253 7159
02 6253 7264
02 6253 7086
02 6253 7036
02 6253 7093
02 6253 7210
02 6253 7100
02 6253 7025
02 6253 7192
02 6253 7348

Canberra

John Berg
Simon Konecny
Mark Sheridan

02 9581 7624
02 9581 7585
02 9581 7569

Sydney

Paul Lang
Kenneth Eagle
Lynette Lenaz
Teresa Miraglia
Cathy Reid
Jo Ziino
Stuart Hilton

03 9242 1322
03 9242 1290
03 9242 1358
03 9242 1493
03 9242 1203
03 9242 1312
03 9242 1431

Melbourne

Peter Blennerhassett

07 3360 5767

Brisbane

Lee-Sai Choo
Scott Slater

08 9268 1137
08 9268 1144

Perth

Peter Whatson

08 8205 4287

Adelaide

Peter Bowen

03 6210 2104

Hobart

James Docherty

08 8943 1405

Darwin


ISSN 1448-4803 (Print)
ISSN 2204-6283 (Online)

The material in this briefing is provided to AGS clients for general information only and should not be relied upon for the purpose of a particular matter. Please contact AGS before any action or decision is taken on the basis of any of the material in this briefing.© AGS All rights reserved